(a) Easements provided for utility lines shall be at least twenty (20) feet in width for sanitary sewers and water lines and at least ten (10) feet for other utilities.
(b) Watercourses. The subdivider shall dedicate rights-of-way or provide easements for storm drainage purposes which conform substantially with the lines of any natural watercourses, channels, streams, or creeks which traverse the subdivision or for any new channel which is established to substitute for a natural watercourse, channel, stream, or creek. Such rights-of-way or easements shall be of a width which will provide for the maintenance needs of the channel and incidental structures as determined by the Planning Commission. Easements shall be provided for the entire area of detention basins/retention ponds.
(Ord. 2021-17. Passed 9-8-21.)