(A) Users required to obtain a significant industrial user permit shall complete and file with the town an application in the form prescribed by the POTW Director, and accompanied by an application fee in the amount prescribed in the schedule of charges and fees. Significant industrial users shall apply for a significant industrial user permit within 90 days after notification of the POTW Director’s determination in § 52.051(B) above. The application shall include at a minimum:
(B) (1) Name of industrial user;
(2) Address of industrial user;
(3) Standard industrial classification (SIC) code(s) or expected classification and industrial user category;
(4) Wastewater flow;
(5) Types and concentrations (or mass) of pollutants contained in the discharge;
(6) Major products manufactured or services supplied;
(7) Description of existing on-site pretreatment facilities and practices;
(8) Locations of discharge points;
(9) Raw materials used or stored at the site;
(10) Flow diagram or sewer map for the industrial user;
(11) Number of employees;
(12) Operation and production schedules; and
(13) Description of current and projected waste reduction activities in accordance with G.S. § 143-215.1(g).
(Ord. passed 5-3-2007; Ord. passed 2-4-2013)