§ 52.051 SIGNIFICANT INDUSTRIAL USER DETERMINATION.
   (A)   All significant industrial users shall obtain a significant industrial user permit prior to the commencement of discharge to the POTW. Existing industrial users who are determined by the POTW Director to be significant industrial users shall obtain a significant industrial user permit within 180 days of receiving notification of the POTW Director's determination. Industrial users who do not fit the significant industrial user criteria may, at the discretion of the POTW Director, be required to obtain a wastewater discharge permit for non-significant industrial users.
   (B)   All persons proposing to discharge non-domestic wastewater, or proposing to change the volume or characteristics of an existing discharge of non-domestic wastewater, shall request from the POTW Director a significant industrial user determination. If the POTW Director determines or suspects that the proposed discharge fits the significant industrial user criteria, he or she will require that a significant industrial user permit application be filed.
(Ord. passed 5-3-2007; Ord. passed 2-4-2013) Penalty, see § 52.999