§ 156.106 SUBDIVISION PROCESSING; SCHEDULE.
   (A)   Definitions. For the purpose of this section, the following definitions shall apply unless the context clearly indicates, or requires, a different meaning.
      ENGINEERING CHECKING AND IMPROVEMENT INSPECTION. The work performed by the City Engineer in checking the plans for road construction and utility installation as proposed by the subdivider and the in-site inspection of the actual construction to ensure conformance with city standards.
      PLANNING PROCESSING. The procedure followed by the staff of the Planning Commission in accordance with the city subdivision ordinance in checking and reviewing proposed subdivisions leading to final approval by the city.
      RURAL SUBDIVISIONS. Subdivisions in a primarily agricultural or rural area and in which the requirements of curbs, gutters, and sidewalks have been waived by the city in accordance with § 156.091.
   (B)   Fee schedule.
      (1)   A subdivider proposing a subdivision in the city shall deposit with the city a non-refundable fee for planning processing at the time of submission of the preliminary plan to help defray the planning costs incurred by the city.
      (2)   The subdivider shall also deposit with the city a non-refundable fee for engineering checking and improvement inspection at the time of final approval of the subdivision by the city to help defray the engineering costs incurred by the city.
      (3)   Both of these fees shall be in accordance with the fee schedule listed below:
 
Lots
Processing fee
Rural subdivisions
Urban subdivisions
1-4
$50
$50
$50 + $10 a lot
5-9
$50 + $5 a lot
$100+ $5 a lot
$100 + $10 a lot
10+
$100 + $5 a lot
$100 + $10 a lot
$100 + $15 a lot
 
(Ord. 3-92 passed 1-15-1992)