A. Installation Of Improvements: The owner or subdivider shall install storm and sanitary sewers, water supply systems, street grading and pavement, alleys, cross-walkways, public utilities, street lighting, and street signs in accordance with applicable ordinances and standards of construction of the Village.
B. Certification By Engineer: No subdivision of land shall be approved without receiving a statement signed by the Village Engineer, certifying that the improvements described in the subdivider's plans and specifications together with agreements, meet the minimum requirements of all ordinances by the Village.
C. Compliance With Specifications: The construction of improvements required by those regulations shall be in accordance with and to the specifications set forth in the following, as applicable:
1. Standard Specifications for Road and Bridge Construction, IDOT, current edition;
2. Standard Specifications for Water and Sewer Main Construction in Illinois, Illinois Society of Professional Engineers, et al., current edition;
3. Design Manual and Highway Standards, IDOT, Division of Highways, current edition;
4. Supplemental Specifications and Recurring Special Provisions, IDOT, July 1, 1988;
5. Special Provisions and Specifications, IDOT, Division of Local Roads and Streets;
6. Interim Special Provisions, adopted subsequent to issuance of Supplemental Specifications and mimeographed Special Provisions booklet;
7. Manual on Uniform Traffic Control Devices for Streets and Highways, adopted by IDOT;
8. Standard Specifications for Traffic Control Items, current edition.
D. Storm Water Control Facilities: Storm water control facilities shall be provided in conformance with Chapter 11 of this Ordinance, Flood Plain and Storm Water Management, and in accordance with:
1. Illinois Department of Transportation Division of Highways (IDOT) Design Manual and Highway Standards, current edition;
2. IDOT Supplemental Specifications and Recurring Special Provisions. (Ord. 92-1855, 12-14-1992)