8-5-3: SERVICE CONNECTIONS; DEPOSITS AND FEES:
   A.   Permit To Connect; Deposits And Fees: No connection with a water main shall be made without a permit being issued and twenty four (24) hours' notice having been given to the department of public works. The fees and deposits for such permits shall be as prescribed in title 9, chapter 1 of this code. All such connections shall be made by or under the supervision of the department of public works.
   B.   Meter And Shutoff Box Required; Inspection: Before connection is made with the water distribution system, the premises to be served must be equipped with a meter and shutoff box properly installed on the service pipe, as provided in this chapter. No installation shall be covered until it has been inspected by the department of public works and found to be satisfactory. (Ord. 03-2233, 4-21-2003)