A. Plan Review Fee: Fees for plan review shall be two hundred fifty dollars ($250.00) plus as follows:
Cubic Feet | Building | Building Plumbing Mechanical | Building/ Plumbing Mechanical/ Electrical
|
Cubic Feet | Building | Building Plumbing Mechanical | Building/ Plumbing Mechanical/ Electrical
| |
Up to 60,000 | $375.00 | $ 575.00 | $ 750.00 | |
60,001 | to 80,000 | 475.00 | 675.00 | 900.00 |
80,001 | to 100,000 | 575.00 | 875.00 | 1,175.00 |
100,001 | to 150,000 | 675.00 | 975.00 | 1,300.00 |
150,001 | to 200,000 | 775.00 | 1,100.00 | 1,500.00 |
200,001 | plus | 875.00 plus 9.00 per 10,000 cubic feet | Building fee x 1.5 | Building fee x 2.0 |
Minor residential remodel | $65.00 | |||
Footing and foundation | 25 percent of building review (minimum $375.00) | |||
Commercial/industrial zoning | $120.00 per 20,000 square feet of site area | |||
1 and 2 single-family dwellings: | ||||
Up to 3,000 square feet (including basement square feet) | $850.00 per dwelling unit | |||
Over 3,000 square feet (including basement square feet) | $0.15 per square foot | |||
Elevator plan review | $450.00 per elevator bank | |||
Hood and duct plan review | $350.00 per system | |||
Spray booth plan review | $400.00 per booth | |||
Miscellaneous plan review | $175.00 per hour/one hour | |||
Inground pool plan review | $500.00 per pool | |||
Aboveground pool plan review | $100.00 per pool | |||
NFPA 101 plan review | 25 percent of building review with a minimum of $250.00 | |||
Priority express review | x 2.5 of base plan review | |||
HPM, high hazard, processing piping | x 1.5 of base plan review | |||
Fire code | 50 percent of review | |||
Energy code | 50 percent of review | |||
Fire suppression and detection systems: | ||||
Fire suppression systems (includes fire pump, hose stations and standpipes) | ||||
Hydraulically calculated | ||||
Number of sprinklers: | ||||
Up to 100 | $400.00 | |||
101 to 200 | 500.00 | |||
201 to 300 | 625.00 | |||
301 to 500 | 735.00 | |||
Over 500 | 865.00 | |||
Pipe schedule (see miscellaneous plan review) | ||||
Alternate Fire Protection Systems: | ||||
Carbon dioxide, clean agent systems | $125.00 ($0.80 each pound over 35 pounds) | |||
Halon | $135.00 up to 35 pounds ($2.50 each pound over) | |||
Fire detection and alarm system | $165.00 first 15,000 square feet (prorated every 15,000 square feet thereafter) | |||
Dry chemical | $350.00 plus alarm fees | |||
B. Building Permit Fee: The fee for any such permit and required inspection shall be as follows:
1. Single-family dwelling and two-family dwelling: | ||
Fee - $2,000.00 per dwelling unit | ||
2. Commercial buildings, multiple apartment buildings, motels and hotels: | ||
Fee - 3 percent of actual construction cost to $500,000.00 | ||
1
1/2 percent of actual construction cost of $500,001.00 to $1,000,000.00 | ||
1 percent of actual construction cost of $1,000,001.00 on up, with a minimum fee of $150.00 | ||
Construction cost determined from actual construction contracts and/or established cost per square foot for the Chicago area by construction type published quarterly by BOCA. | ||
3. Remodeling where inspection is required at the discretion of the building commissioner: | ||
Fee - residential | $75.00 | |
Fee - commercial | Same as subsection B2 of this section, but no less than $150.00 | |
Inspections | As required by the building commissioner. | |
4. Garages: | ||
Fee - residential | $75.00 | |
Fee - commercial | Same as subsection B2 of this section, but no less than $150.00 | |
5. Wrecking or removing building: | ||
Fee - residential | $75.00 | |
Fee - commercial | Same as subsection B2 of this section, but no less than $150.00. | |
6. Swimming pools: | ||
Fee - residential | Aboveground $75.00 | |
Inground $150.00 | ||
7. Satellite dish antennas (over 39 inches), antennas (over 12 feet in height), fences, sheds: | ||
Fee - | $50.00 | |
8. Insulation, reroofing, residing, sidewalks, decks, storage sheds: | ||
Fee - residential | $50.00 | |
Fee - commercial | Same as subsection B2 of this section, but no less than $150.00 | |
9. Fireplaces: | ||
Fee - residential | $50.00 | |
Fee - commercial | Same as subsection B2 of this section, but no less than $150.00 | |
C. Mechanical Permit Fee: The fee for any such permit and required inspections shall be a follows:
1. Residential: Furnace, boiler, central air, pool heaters, solar heaters - $50.00
2. Commercial buildings, multiple apartment buildings, motels and hotels:
Fee - 3 percent of actual construction cost to $500,000.00.
11/2 percent of actual construction cost of $500,001.00 to $1,000,000.00.
1 percent of actual construction cost of $1,000,001.00 on up, with a minimum fee of $150.00.
Construction cost determined from actual construction contracts and/or established cost per square foot for the Chicago area by construction type published quarterly by BOCA.
3 percent of actual cost of mechanical work - $150.00 minimum fee.
Elevator, escalator, dumbwaiters, hoist - $65.00 per inspection.
A minimum of 1 inspection each 6 months.
D. Plumbing Permit Fee: The fee for any such permit and required inspections shall be as follows:
1. Residential: Water heater, sewer or water service line, clean out - $50.00.
2. Commercial buildings, multiple apartment buildings, motels and hotels:
Fee - 3 percent of actual construction cost to $500,000.00.
11/2 percent of actual construction cost of $500,001.00 to $1,000,000.00.
1 percent of actual construction cost of $1,000,001.00 on up, with a minimum fee of $150.00.
Construction cost determined from actual construction contracts and/or established cost per square foot for the Chicago area by construction type published quarterly by BOCA.
E. Electrical Permit Fee: The fee for any such permit and required inspections shall be as follows:
1. Residential: New service, new panel, basement upgrade, and temporary service - $50.00.
2. Commercial buildings, multiple apartment buildings, motels and hotels:
Fee - 3 percent of actual construction cost to $500,000.00.
11/2 percent of actual construction cost of $500,001.00 to $1,000,000.00.
1 percent of actual construction cost of $1,000,001.00 on up, with a minimum fee of $150.00
Construction cost determined from actual construction contracts and/or established cost per square foot for the Chicago area by construction type published quarterly by BOCA.
F. Permit Extension Timeline, Fees, And Approval Process:
Extension Period | Responsible For Considering Extension | Extension Fee | Extension Process |
6 - 12 months | Building official extension | No fee | Building official authorizes the first 6-month extension. A letter is sent to the permit holder advising that all future extensions will require Village Board approval. |
12 - 18 months | 1st Village Board extension | $ 50.00 | A permit extension request is submitted to the President and Board of Trustees for approval. |
18 - 24 months | 2nd Village Board extension | 100.00 | A permit extension request is submitted to the President and Board of Trustees for approval. |
24 - 30 months | 3rd Village Board extension | 200.00 | A permit extension request is submitted to the President and Board of Trustees for approval. |
30 - 36 months | 4th Village Board extension | 250.00 | A permit extension request is submitted to the President and Board of Trustees for approval. |
36 - 42 months | 5th Village Board extension | 300.00 | A permit extension request is submitted to the President and Board of Trustees for approval. |
(Ord. 89-04, 4-3-1989; amd. Ord. 2003-16, 4-21-2003; 2004 Code; Ord. 2017-21, 9-25-2017)