§ 53.22 SEWER MAIN EXTENSION POLICY.
   Sanitary sewer connections inside town limits shall adhere to the following provisions:
   (A)   Main sewer extensions will require a minimum of eight-inch diameter pipe;
   (B)   Sewer main lines will be installed by the developer or property owners per DEQ requirements and any applicable permit fees; and
   (C)   After inspection for proper installation, the town accepts ownership and maintenance.
(Ord. passed 7-1-2022)