The following standards represent broad parameters under which all PUD developments must be designed:
(a) Central Water and Sewer Facilities.
All structures in developments approved as a PUD must be served by central public water and sewer facilities. (No package waste water treatment plants or separate water supply systems, private or public.)
(b) Development Layout and Design.
The design and layout of all PUDs shall display excellence in design by properly considering significant site features, such as topography, natural drainage patterns, roadway access and circulation, surrounding land uses, and general public welfare to result in desirable land development. Attractive landscaped buffers shall be provided between incompatible land uses and activities.
(c) Front, Side, and Rear Setback Standards for Perimeter Lots.
All lots that are located along the perimeter of the PUD shall have minimum front, side and rear setbacks equal to those that would normally be specified in the zoning district prevailing at the time of application for PUD approval or twenty-five feet (25 ft.), whichever is greater.
(d) Off-Street Parking and Loading Facilities.
For all land uses located within the PUD, the parking and loading standards contained in Chapter 1143 shall be applied.