§ 97.039 FAILURE TO COMPLY.
   If the repair is not made within the 10 day period, it shall be the duty of the Street Commissioner to proceed without delay, under the direction of the City Engineer, to repair the sidewalk, curb or gutter or all of them, in the most approved manner, restoring them and each of them as near as may be to the condition they were in just before the repair became necessary, in harmony as near as possible with the original plan of construction; and when the work has been done, he or she shall report the same with the cost, including materials and labor to the Clerk-Treasurer, who shall notify the owner of the amount of repair, and if not paid within 10 days from the date of mailing the notice, he or she shall place the same on the special assessment duplicate against the owner and the real estate affected, and the same when so placed shall be a lien against the real estate, and shall be collected as other special assessments are collected.
(Prior Code, § 97.39) Penalty, see § 10.99