5-19-5-13: PUBLIC INFORMATION:
   A.   Public Information Regarding Well Permit Activity:
      1.   After approval of an administrative gas and oil well development permit application, the operator shall submit to the administrator an accurate written time line account of all planned operational events associated with the permit. The account must be updated weekly and must thoroughly describe the events that will occur. Events to be documented shall include, but are not limited to, site preparation and grading, site construction of the drilling rig and accessory structures, the expected amount of time spent drilling on site, all casing installation, testing, disassembly of the drilling rig, pipeline installation, fracture stimulation, maintenance, installation of production facilities, site cleanup and production. (Ord. 76, 9-22-2014)