All plans for new buildings or exterior alterations must be submitted to the Planning Commission/Architectural Review Board, together with separate administration and registration fees, specifications are submitted and before the Planning Commission/Architectural Review Board will make any review as follows:
(a) New Construction; Preliminary Plan Review Prior to Complete Plan Submission; Engineering Deposit.
(1) For each new apartment, business, commercial or industrial building, hotels, motels and multi-family units. Minimum fee: $100.00.
(2) For each single or two family dwelling. Minimum fee: $100.00.
(3) For each accessory building or industrial storage building. Minimum fee: $100.00.
(4) For a residential accessory or storage shed. Minimum fee: $35.00.
(5) Engineering deposit for preliminary plan review of new buildings. Minimum fee: $500.00 (Due at the time of application. All fees not expended shall be returned to the applicant.)
(6) For a special meeting of the Planning Commission/Architectural Review Board. Minimum fee: $300.
(b) Alterations and Additions.
(1) Apartments, business, commercial or industrial buildings, hotels, motels and multi-family units. Minimum fee: $100.00.
(2) For each single or two family dwelling with or without an attached garage. Minimum fee: $75.00.
(3) For each outbuilding, garage in a residential area. Minimum fee: $35.00.
(4) For each deck, swimming pools and all other buildings and structures other than those hereto listed. Minimum fee: $25.00.
(c) Second of Third Readings of Revised Plans. For any plans requiring a second reading, a non-refundable administration fee of fifty dollars ($50.00) per review will be required when submitting revised plans.
(d) Moving Building. Moving any building on the same lot or across a property line: $75.00.
(e) Change in Plans. When revised plans presented after a permit has been issued, an additional filing fee shall be charged and collected before such revised plans shall be considered. The initial fee shall be one hundred dollars ($100.00) plus $2.00 per 100 sq. ft. Maximum: $150.00.
(Ord. 2021-104. Passed 6-15-21.)