To receive final inspection and acceptance of any project, or portion thereof, the following must be completed by the applicant and provided to the City of Warren WPC:
(a) Final stabilization must be achieved and all permanent SCMs must be installed and made functional, as determined by the City of Warren WPC and per the approved Post-Construction Stormwater Control Plan.
(b) An As-Built Certification, including As-Built Survey and Inspection, must be sealed, signed and dated by a Professional Engineer and a Professional Surveyor with a statement certifying that the SCMs, as designed and installed, meet the requirements of the Post-Construction Storm water Control Plan approved by the City of Warren WPC. In evaluating this certification, the City of Warren WPC may require the submission of a new set of SCM calculations if they determine that the design was altered significantly from the approved Post-Construction Stormwater Control Plan. The As-Built Survey must provide the location, dimensions, and bearing of such SCMs and include the name or title of the entity responsible for long-term maintenance as detailed in the Inspection and Maintenance Agreement.
(c) A copy of the complete and recorded Inspection and Maintenance Plan and Inspection and Maintenance Agreement as specified in Section 936.08 must be provided to the City of Warren WPC.
(Ord. 13157/2022. Passed 9-28-22.)