923.02 CONNECTIONS TO BE INSPECTED AND APPROVED PRIOR TO COVERING.
   Any licensed sewer building or plumber making any connection with a public sewer, and before covering the same, shall have the connection inspected and approved by the City Engineer. No lateral shall be left open or exposed.
   The City Engineer shall be notified by the plumber or sewer builder when the work is ready for inspection. All work shall be left uncovered and convenient for examination when practicable until inspected and approved. All sewer connections shall be inspected from the point of commencement to a point within three feet of the outside wall of the building. No notice shall be sent for any inspection until the work is entirely ready for the same.
(Ord. 9865/87. Passed 12-9-87.)