Treatment charges for septic tank waste or waste from privately owned and operated package sewage treatment plants shall be the following:
Effective September 1, 2021 a minimum of twenty-five dollars ($25.00) per month for each septage delivery contractor for septic waste delivered to the treatment plant or a charge of six cents ($0.06) per gallon delivered, whichever is greater. The volume of septic waste delivered will be determined by a WPC flow meter if available or estimated by the volume of the tank on the truck deliverying the septage.
(Ord. 13032/2021. Passed 7-14-21.)