5.32.410: ORDER TO CEASE OPERATIONS:
A.   If the oil and gas inspector finds that, in his judgment, a hazard to life or natural resources exists, he shall order immediate rectification of the cause. If the permittee takes no immediate measure to reduce the hazard, or if the situation be so perilous as to constitute an imminent threat to safety, then in either of these events he may order the prompt cessation of activity, and if necessary, the clearance of the premises.
B.   The oil and gas inspector shall apply to the mayor for a hearing upon such order, which hearing shall be held not longer than twenty four (24) hours after the issuance of said order by the oil and gas inspector. The mayor shall determine if proper cause existed, and, if not, shall authorize the permittee's activity to resume without delay. If the mayor determines that proper cause did exist for the order to cease activity to issue, then he shall make whatever ruling is proper to assure rectification of the cause of the peril. Such ruling and compliance with it by the permittee shall not be construed to absolve the permittee of any liability for any violation of this chapter or for any damage or injury caused thereby. (Ord. 528 §1, 1982)