5.32.350: WATER FOR MUDS:
In the event a freshwater supply well is drilled to provide water for drilling muds, upon the completion of operations for which such well is required, such well shall be plugged by cementing top to bottom, after notice of intention to so plug is provided the oil and gas inspector, who may supervise the operation. (Ord. 528 §1, 1982)