For highly fluctuating loads, such as welders, electric melting furnaces or other unbalanced single phase loads, the Utility reserves the right to require that such loads be converted to three-phase operation so that, as far as is practical, the load on each phase is balanced.
(Ord. 2015-28. Passed 9-14-15.)