To equalize flows and to avoid temporary overloads, the POTW Director may require any person that discharges into the town’s POTW sanitary sewer system to requires persons to construct and maintain on their property and at their expense, in accordance with its adopted sewer use ordinance and all applicable local, state and federal rules and regulations, suitable storage tanks or equivalent flow control facilities. The control of the volume of discharges of waste shall be by a waterworks type rate controller or equivalent device, the setting and operations of which shall be subject to the direction of the POTW Director. A wastewater discharge permit may be issued solely for flow equalization to the user.
(Ord. passed 10-14-2021)