Industrial users shall provide wastewater treatment as necessary to comply with this chapter and wastewater permits issued under §§ 50.095 through 50.101 of this chapter and shall achieve compliance with all applicable national categorical pretreatment standards, local limits and the prohibitions set out in this subchapter, within the time limitations specified by the POTW Director, the EPA or the state, whichever is more stringent. All facilities necessary for compliance shall be provided, operated and maintained at the industrial user’s expense. Detailed plans showing the proposed pretreatment facilities and operating procedures shall be submitted to the town for review and shall be submitted to and approved by the POTW Director before construction of the facility. Any subsequent changes in the pretreatment facilities or method of operation shall be reported to the town and, if required, to the POTW Director for approval prior to the industrial user’s initiation of the changes. Neither the review nor the approval of such plans and operating procedures shall relieve the industrial user from the responsibility of requiring modification of the pretreatment facility as necessary to produce an effluent in compliance with the provisions of this chapter.
(Ord. passed 10-14-2021)