(A) If sampling performed by an industrial user/satellite town indicates a violation, the industrial user/satellite town must notify the POTW Director within 24 hours of becoming aware of the violation. The industrial user/satellite town shall also repeat the sampling and analysis and submit the results of the repeat analysis to the POTW Director within 30 days after becoming aware of the violation. If allowed by the POTW Director, an industrial user/satellite town is not required to resample:
(1) If the POTW Director monitors at the industrial user’s facility at least once a month; or
(2) If the POTW Director samples between the industrial user’s initial sampling and when the user receives the results of this sampling.
(B) If the POTW has performed the sampling and analysis in lieu of the user and the POTW sampling of the an industrial user/satellite town indicates a violation, the POTW shall repeat the sampling and obtain the results of the repeat analysis within 30 days after becoming aware of the violation, unless one of the following occurs:
(1) The POTW monitors at the user’s facility at least once a month;
(2) The POTW samples the user between their initial sampling and when the POTW receives the results of this initial sampling; or
(3) The POTW requires the user to perform sampling and submit the results to the POTW Director within the 30-day deadline of the POTW becoming aware of the violation.
(Ord. passed 10-14-2021)