The floors of all shower stalls shall be lined with sheet lead and be turned up the side walls at least six inches, when laid on cement or concrete, to be given a coating of asphaltum on both sides, including the upstands, if laid on wood, place a layer of asphalt-saturated building paper under the pan and coat the inside and upstands with asphaltum, securely solder the two-inch waste to the lead pan, using a brass shower pan strainer of an approved pattern.
(Prior Code, § 10-3-16) Penalty, see § 153.999