1109.03 PRELIMINARY DRAWING REQUIRED.
   After the preapplication stage, the subdivider shall submit a preliminary drawing of the proposed subdivision which shall conform with the requirements set forth in Sections 1109.04 to 1109.11, inclusive. The preliminary drawing shall be prepared by a qualified registered engineer or surveyor.
(Ord. 7-77. Passed 6-13-77.)