1117.20 ELECTRIC, GAS, AND TELEPHONE IMPROVEMENTS.
   (a)   Electric service and telephone service shall be provided within each subdivision. Gas service may be required where reasonably accessible. Whenever such facilities are reasonably accessible and available they may be required to be installed within the area prior to the approval of the final plat. Telephone, electric, and street lighting wires, conduits and cables shall be constructed underground except in cases where the Planning Commission determines that topographic, bedrock, or underground water conditions would limit proper installation.
 
   (b)   Overhead utility lines, where permitted, shall be located at the rear of all lots. The width of the easement per lot shall be not less than eight feet and the total easement width shall be not less than sixteen feet.
 
   (c)   Whenever more than one utility including (sanitary sewers, storm sewers and waterlines) are placed underground in the same utility easement, the location of the utilities and the width of the easement shall be determined by the Village Engineer. The total easement width shall not be less than twenty feet.
(Ord. 7-77. Passed 6-13-77.)