Curbs and gutters shall be installed to grades and at locations approved by the city engineer prior to the issuance of building permit on any site within the subdivision. Sidewalks shall be required as a condition of building permits, except as follows:
A. Double fronting lots, where allowed, shall have the sidewalk installed along the frontage from which the lot will not be receiving access, as a condition of final map approval.
B. A corner lot where a fence or wall is constructed along the street-side lot line as a part of the subdivision, improvements shall have sidewalks installed along the street-side as a condition of final map approval. (Ord. 2017-01 (part), 2017: Ord. 2013-07, 2013)