16.28.140   Information on final parcel map.
   A.   Each parcel shall be consecutively numbered. Each parcel shall have its area shown to the nearest one-hundredth (0.01) of an acre or nearest square foot. The exterior boundary of the land included within the parcel or parcels being created shall be indicated by a distinctive border. Such border shall not interfere with the legibility of figures or other data. The map shall show the definite location of such parcel or parcels, and particularly the relationship to existing surveys.
   B.   Each final parcel map shall contain the following information:
   1.   The tentative parcel map number and date of preparation;
   2.   The tract name, date, north arrow and scale;
   3.   A general description of the land included;
   4.   Names and addresses of the owners of the property being divided;
   5.   The location, names without abbreviations, and right-of-way widths of all:
   a.   Proposed streets;
   b.   Proposed public areas and easements; and
   c.   Adjoining streets;
   6.    All dimensions shall be in feet and decimals of a foot to the nearest one-hundredth of a foot (0.01'); all necessary angles and bearings shall be provided to the nearest second of a degree (00º-00'-01");
   7.   The dimensions of all lots, including lot area in square feet, and a lot number for each lot;
   8.   The centerline data for streets including bearings and distances;
   9.   The radius, arc length, and central angle of curves;
   10.   Suitable primary survey control points;
   11.   The location and description of permanent monuments;
   12. The boundaries of any public and/or private easement, whether an easement of record or a prescriptive easement, shall be shown; the party holding interest in the easement shall be shown on the map;
   13.   Location and widths of all easements to be dedicated, if required;
   14.   The location and widths of watercourses and areas subject to inundation and location of selected flood lines within the parcels being created; properties located in a Special Flood Hazard Area shall comply with all requirements of Chapter 15.60;
   15.   Ties to any city or county boundary lines involved;
   16.   Required Certifications;
   a.   All required dedications of rights-of-way or easements shall be certified on the final parcel map in accordance with Section 66447 of the Subdivision Map Act;
   b.   All parties having any record title interest in the real property subdivided shall sign a certificate on the final parcel map in accordance with Subsection 66445(e) of the Subdivision Map Act;
   c.   A certificate of the registered civil engineer or licensed land surveyor who prepared the survey and the final parcel map, in compliance with Section 66449 of the Subdivision Map Act;
   d.   A certificate for execution by the City Engineer/City Surveyor that complies with Section 66450 of the Subdivision Map Act;
   e.   A certificate for execution by the city planner on behalf of the parcel map committee certifying that the final parcel map conforms to the approved tentative parcel map; and
   f.   All other certificates as required;
   17.   Any other requirements of the Subdivision Map Act.
   B.   The final parcel map shall contain survey information that only affects record title interest. However, additional survey and map information such as, but not limited to, building setback lines, flood hazard zones, seismic lines and setback, geologic mapping and archaeological sites, if appropriate, shall be shown on an additional map sheet that shall indicate its relationship to the final parcel map, and shall contain a statement that the additional information is for informational purposes, describes conditions as of the date of filing, and is not intended to affect record title interest. The additional map sheet may also contain a notation that the additional information is derived from public records or reports, and does not imply the correctness or sufficiency of those records or reports by the preparer of the additional map sheet. The acceptance of the additional map sheet by the city, similarly does not imply the correctness or sufficiency of those records or reports. The additional map sheet shall be recorded simultaneously with the final parcel map. (Ord. 2017-01 (part), 2017: prior code § 9275)