16.24.030   Survey and monument requirements.
   A.   The final map shall show the centerlines of all streets; the lengths, tangents, radii and central angle or radial bearings of all curves; the bearings of radial lines to each beginning and end of a curve; the total width of each street; the width of the portion being dedicated, the width of the existing dedication, and the width each side of the centerline; and the width of rights-of-way of railroads, flood control or drainage channels, and any other easements appearing on the map.
   B.   Sufficient data shall be shown to readily determine the bearing and length of each line. Dimensions of lots shall be the net dimensions. No ditto marks shall be used. Lots containing one acre or more shall show net acreage to the nearest hundredth.
   C.   Surveys in connection with the preparation of subdivision maps shall be made in accordance with standard practices and principles for land surveying. A traverse of the boundaries of the subdivision and all lots and blocks shall close within a limit of error of 0.005 feet. Distances shall be to nearest one-thousandth (0.001) of a foot. Bearings and angles shall be to the nearest second of a degree (00º-00'-01").
   D.   The final map shall show clearly what monuments or other evidence were found on the ground to determine the boundaries of the tract. The corners of adjoining subdivisions, or portions thereof, shall be identified, and distances thereto shall be shown. (Ord. 2017-01 (part), 2017: prior code § 9170)