(A) All street improvement plans, construction, installations and plantings shall conform to the specifications approved by the Division of Highways of the state for the type of pavement designated as Class “A” and subclass “A-3” in the Specifications for Water and Sewer Main Construction in Illinois as established by the Illinois Society of Professional Engineers.
(B) The general street layout shall conform to that shown on the approved preliminary plan.
(C) All streets shall be completely improved to the full width of the right-of-way and shall include the below listed items:
(1) Pavements shall be installed to an overall width in accordance with the following minimum dimensions:
Type of Street | Pavement Width (back to back of curbs) |
Collector | 38 feet |
Cul-de-sac | 32 feet |
Cul-de-sac turnaround | 80 feet |
Minor | 32 feet |
(2) Curbs and gutters and storm water inlets, with all corner curbs having a radius of not less than 16 feet. Plans shall indicate the direction of flow along all curbs.
(3) Street lights, including all necessary poles, brackets, luminaries and lamps.
(4) Concrete sidewalks along all property lines coincidental with street right-of-way lines.
(1975 Code, § 34.22)