§ 151.22 PERMIT REQUIRED.
   (A)   No alteration or change shall be made in the wiring or appliances of any building, nor shall any wiring be done for electric lights, meters or heating devices without first obtaining a permit therefor from the City Clerk, nor shall any change be made in any wiring or appliances after inspection without notice to the City Clerk and obtaining an additional permit therefor.
   (B)   Upon receipt of an application for such permit, the City Clerk shall refer such application to the Electrical Inspector of the city and such permit shall be issued by the City Clerk only upon receipt of the approval of such Inspector.
   (C)   The fee for an electrical permit shall be as follows for both electrical and plumbing:
      (1)   First 1,000 feet: $5 minimum; and
      (2)   Over 1,000 feet: $1.50 per 1,000 feet.
(1975 Code, § 13.03) (Ord. 351, passed 7-19-1965)