(a) Design and Construction Standards. In order to prevent excessive damage to buildings, structures, and related utilities and facilities, the following restrictions apply to all development, subdivision proposals, manufactured home parks, new construction and to construction of substantial improvements, and the repair of substantial damage, to existing
structures occurring in the Special flood hazard area.
(1) Basements and Lowest Floors.
A. Residential Structures - All new construction, relocation, substantial improvements, including repair of substantial damage, of residential structures shall have the lowest floor, including basement, ductwork and utilities, elevated to two feet above the Base Flood Elevation.
B. Non-residential Structures - All new construction, relocation, substantial improvements, including repair of substantial damage, of nonresidential structures shall have the lowest floor, including basement, ductwork and utilities, elevated to two feet above the Base Flood Elevation; or, together with attendant utility and sanitary facilities, be designed so that the structure is water tight with walls substantially impermeable to the passage of water from the lowest structural element to two feet above the Base Flood Elevation.
C. Openings- For all new construction, relocation, substantial improvements, and repair of substantial damage, those fully enclosed areas below the lowest floor that are usable solely for parking of vehicles, building access or storage in an area other than a basement and which are subject to flooding shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for entry and exit of floodwaters. Designs for meeting this requirement shall either be certified by a Registered Professional Engineer or meet or exceed the following minimum criteria:
1. A minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided.
2. The bottom of all openings shall be no higher than one foot above grade.
3. Openings may be equipped with screens, louvers, valves, or other coverings or devices provided that they permit the automatic entry and exit of floodwaters.
D. A non-conversion agreement shall be signed by the applicant on all floodproofed structures and any elevated structures when the City of Vienna determines that the area below the first floor could be converted to a nonconforming use (generally applies to enclosed areas below base flood elevation that are 5 ft. high or more). This agreement shall state:
1. The area below Base Flood Elevation shall not be converted for use other than for parking, building access or for allowable storage as detailed in this Ordinance.
2. The applicant agrees to notify prospective buyers of the existence of the non-conversion agreement. It shall be the responsibility of the applicant to transfer the agreement at closing to the new owner via notarized signature. A copy of all new agreements shall be provided to the Floodplain Administrator. Failure to transfer the agreement and provide a signed copy to the Floodplain Administrator shall subject the violator to the penalties set forth in Section 1759.08(c).
(2) Manufactured Home Placement. Certain unique characteristics of manufactured homes installed in special flood hazard areas pose an elevated risk to safety and substantial damage to property. Therefore:
A. All manufactured homes to be sited within the special flood hazard areas of City of Vienna shall be installed by a contractor possessing a valid WV Manufactured Home Installer's license. The Licensed Manufactured Home Installer shall use an installation design engineered to withstand flood hazards specific to the particular home site. Manufactured homes to be placed or substantially improved within the special flood hazard areas shall be installed in accordance with the following standards:
1. The lowest floor, ductwork and utilities including HVAC/heat pump shall be elevated two feet above the Base Flood Elevation.
2. Elevation shall be on reinforced piers on a permanent foundation, or shall use foundation elements of at least equivalent strength engineered for use in a flood hazard area. Installation designs incorporating dry stacked block piers shall not be used in special flood hazard areas.
3. All manufactured homes shall be securely anchored to an adequately anchored foundation system in compliance with the requirements of 42 West Virginia Code of State Regulations, Series 19, Sections 10.1, 10.2, and 10b as authorized by West Virginia Code § 21-9-4 or the most recent revisions thereof. The anchoring shall be adequate to resist flotation, collapse, or lateral movement. Methods of anchoring may include but are not limited to the over-the-top and frame ties, attached to permanent foundation elements. Ground anchors may not be adequate to satisfy flood specific anchoring requirements. This requirement is in addition to applicable State and local anchoring requirements for resisting wind forces.
4. Permanently attached rigid skirts and/or perimeter wall skirts of brick or block shall have openings to prevent collapse and damage to supporting piers. The openings shall be designed to automatically equalize hydrostatic flood forces by allowing for entry and exit of floodwaters. Designs for meeting this requirement shall either be certified by a Registered Professional Engineer or meet or exceed the following minimum criteria:
a. A minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided.
b. The bottom of all openings shall be no higher than one foot above grade.
c. Openings may be equipped with screens, louvers, valves, or other coverings or devices provided that they permit the automatic entry and exit of floodwaters.
5. Any additions to a manufactured home shall be similarly anchored and vented.
B. The licensed WV Manufactured Home Installer placing the unit shall perform a site inspection and certify in writing that the manufactured home has been installed to the standards set forth in this Ordinance.
(3) Appurtenant Structures.
A. Except as provided in subsection (a)(3)B. below, appurtenant structures shall be located out of the special flood hazard area or elevated to two feet above the Base Flood Elevation.
B. Where appurtenant structures not connected to the principal structure are to be located on sites below the Base Flood Elevation, the following flood damage reduction provisions apply:
1. Use of the structure shall be restricted to parking or limited storage.
2. Structures shall be no more than 200 square feet in size and valued at less than $5,000.00.
3. Floors shall be at or above grade on at least one side.
4. Structures shall be located, oriented and constructed to minimize flood damage.
5. Structures shall be designed (or modified) and adequately anchored to prevent flotation, collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy.
6. Flood resistant materials as detailed in FEMA Technical Bulletin 2 shall be used in the portions of the structure below BFE.
7. Machinery, electric devices or appliances, and all utilities shall be located at least two feet above the Base Flood Elevation.
8. The venting requirements contained in subsection (a)(1) hereof are applicable and shall be strictly adhered to.
C. A non-conversion agreement shall be signed by the applicant stating that the use of the appurtenant structure or detached or attached garage shall not be changed from the use permitted, acknowledging that the structure may be subject to greater flood risk and that higher flood insurance premiums may be possible, and that a change in use may require full compliance with this Ordinance. The applicant agrees to notify prospective buyers of the existence of this agreement. It shall be the responsibility of the applicant to transfer the agreement at closing to the new owner via notarized signature. A copy of all new agreements shall be provided to the Floodplain Administrator. Failure to transfer the agreement and provide a signed copy to the Floodplain Administrator shall subject the violator to the penalties set forth in Section 1759.08(c).
(4) Recreational Vehicle Placement. Recreational vehicles to be placed within any special flood hazard area shall either:
A. Be on site for fewer than 180 consecutive days. Or,
B. Be fully licensed and ready for highway use. A recreational vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the site only by quick disconnect utilities and security devices, and has no permanently attached additions. Or,
C. Be installed in accordance with the Manufactured Home Placement requirements and all other flood reduction requirements contained in this Ordinance.
(5) Fill. The City of Vienna officially recognizes the beneficial functions the floodplain serves in storage and transportation of water during floods. Therefore:
A. Placement of fill in the special flood hazard area is discouraged and should be minimized.
B. No fill shall be permitted in the floodway.
C. Placement of fill in other areas of the special flood hazard area shall be restricted to functional purposes such as elevating a structure. Fill shall only be permitted in the same permit with the related structure or other functional purpose. Placement of fill to dispose of spoil from excavation or to elevate yards, parking lots, or fields will not generally be considered a functional purpose. The Floodplain Administrator may require the developer to provide compensatory storage before permitting fill.
D. No fill shall be permitted unless it meets the requirements of Section 1759.04(a). All fill placed in the special flood hazard area shall meet or exceed the following standards:
1. Fill shall be used only to the extent to which it does not adversely affect adjacent properties. The City of Vienna may require the applicant to demonstrate through engineering reports that proposed fill would not adversely affect adjacent properties. When required, hydrologic and hydraulic analyses shall be undertaken only by Registered Professional Engineers who shall certify that the technical methods used correctly reflect currently accepted technical concepts. The resultant study shall include a cover letter, signed and sealed by the responsible professional, providing a statement of findings in basic terms. In addition, studies, analyses, computations, etc., shall be submitted in sufficient detail to allow a thorough technical review by the City of Vienna. During permit review the City of Vienna shall consider the following issues that have the potential to cause adverse impact to adjacent properties:
a. Unacceptable increases in flood heights.
b. Blocking drainage from adjacent property.
c. Deflection of floodwaters onto adjacent existing structures.
d. Increases to stream velocity initiating or exacerbating erosion problems.
e. Other unique site conditions may be considered when determining whether fill will cause adverse impact to adjacent property including, but not limited to, subsidence areas, Karst topography, stream blockages, and steep topography adjacent to the channel.
2. Fill shall be used only to the extent to which it does not adversely affect the capacity of channels or floodways of any tributary to the main stream, drainage ditch, or any other drainage facility or system.
3. Filled site shall be contoured to drain properly (avoid ponding).
4. Fill shall extend beyond a structure for a sufficient distance to provide acceptable access. For residential structures, fill shall extend laterally fifteen (15) feet beyond the building line from all points before the start of sloping required in following subsection. For nonresidential structures, fill shall be placed to provide access acceptable for intended use. At grade access, with fill extending laterally fifteen (15) feet beyond the building line shall be provided to a minimum of twenty-five percent (25%) of the perimeter of a nonresidential structure.
5. Fill shall consist of soil or rock material only. Sanitary landfills shall not be permitted; no trash or woody debris shall be buried on site.
6. Fill material shall be compacted to provide the necessary stability and resistance to erosion, scouring or settling. Fill compaction standards shall be appropriate to proposed post fill use; particular attention is necessary when fill is being used to elevate a structure.
7. Fill slopes shall be no steeper than one (1) vertical on two (2) horizontal, unless substantiating data justifying steeper slopes are submitted to and approved by the Floodplain Administrator.
8. Fill site and fill shall be protected from erosion.
a. Fill slopes exposed to flood waters with expected velocities during the occurrence of the base flood of five feet per second or less will be protected from erosion by covering them with grass, vines, weeds, or similar vegetative undergrowth.
b. Fill slopes exposed to flood waters with expected velocities during the occurrence of the base flood of greater than five feet per second will be protected from erosion by armoring them with stone or rock slope protection.
9. All applicants placing fill in a special flood hazard area shall obtain a Conditional Letter of Map Revision (CLOMR) from FEMA when directed to do so by the Floodplain Administrator before a permit can be issued. After fill is finished the applicant shall convert the CLOMR to a Letter of Map Revision based on Fill (LOMR-F) before a certificate of compliance can be issued.
10. The applicant shall submit any maps, computations or other material required by the Federal Emergency Management Agency (FEMA) to revise the Flood Insurance Study and/or Flood Insurance Rate Maps, when notified by the Floodplain Administrator, and shall pay any fees or other costs assessed by FEMA for this purpose.
(6) Placement of Structures and other development. All structures and other development shall be constructed or placed on the lot so as to offer the minimum obstruction to the flow of water and shall be designed to have a minimum obstruction effect upon the flow and height of floodwater.
A. Whenever possible, structures and other development shall be constructed with the longitudinal axis parallel to the direction of flood flow and,
B. So far as practicable, structures and other development shall be placed approximately on the same flood-flow lines as those of adjoining structures or development.
(7) Anchoring.
A. All structures and other development including stream crossings shall be firmly anchored in accordance with accepted engineering practices to prevent flotation, collapse, and lateral movement, thus reducing the threat to life and property and decreasing the possibility of the blockage of bridge openings and other restricted sections of the watercourse.
B. All air ducts, large pipes, swimming pools and storage tanks located at or below the Base Flood Elevation shall be firmly anchored to resist flotation.
(8) Flood Protection Setback.
A. A Flood Protection Setback equal to twice the width of the watercourse channel measuring from the top of one bank to the top of the opposite bank or 50 feet, whichever is less, shall be maintained from the top of the banks of all watercourses. To reduce erosion, natural vegetation shall be maintained in this area. Where natural vegetation does not exist along the watercourse and conditions for replanting are suitable, high priority shall be given to planting vegetation in the setback area to stabilize banks, enhance flood protection and benefit aquatic resources.
B. Necessary public works and temporary construction may be exempted from this subsection.
C. The Floodplain Administrator may consider an appeal to the Flood Protection Setback requirement if the applicant demonstrates that it is impossible to allow any development without encroachment into the Flood Protection Setback area The appeal conditions shall be the minimum necessary and shall be made only after due consideration is given to varying other siting standards, such as side, front and back lot line setbacks.
(9) Storage.
A. No materials that are buoyant, flammable, explosive, or in times of flooding could be injurious to human, animal or plant life, shall be stored below Base Flood Elevation.
B. Storage of other material or equipment may be allowed if not subject to major damage by floods and firmly anchored to prevent flotation or readily removable from the area within the time available after flood warning.
C. Due to the potential of masking the natural elevation and making it more difficult to enforce this Ordinance, material that resembles "fill" material shall not be considered "storage" material for purposes of this subsection.
(10) Utility and Facility Requirements.
A. All new or replacement water systems whether public or private, shall be designed to minimize or eliminate infiltration of floodwaters into the systems.
B. All new or replacement sanitary disposal systems, whether public or private, shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters.
C. All other new or replacement public and/or private utilities and facilities shall be located and constructed to minimize or eliminate flood damage.
D. Onsite waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding.
(11) Drainage.
A. Adequate drainage shall be provided to reduce exposure to flood hazard.
B. Adequate drainage paths are required around structures on slopes within zones AH and AO to guide floodwaters around and away from proposed structures.
(12) Backflow Preventers. Back flow prevention valves should be used for all enclosed structures with sewage or drainage facilities located in the special flood hazard area.
(Ord. 05-13. Passed 9-12-13.)
(a) Designation of Floodplain Administrator: The Building Inspector is hereby appointed as Floodplain Administrator and is vested with the responsibility, authority and means to implement the commitments made in our agreement with the Federal Government to administer and implement this local law by granting or denying floodplain development permits in accordance with its provisions. The Floodplain Administrator shall also be responsible for submitting all required reports to FEMA concerning the City of Vienna's participation in the National Flood Insurance Program.
(b) Development Permits and Site Plan Approvals Required. It shall be unlawful for any contractor, person, partnership, business, or corporation to undertake or cause to be undertaken, any development or the new construction, substantial improvement, repair of substantial damage, the placement or relocation of any structure (including manufactured homes) within City of Vienna, unless a permit application and standard site plan has been completed, and a permit has been obtained from the Floodplain Administrator. In addition, where land that is either partially or fully in the special flood hazard area is to be subdivided, utilized for a manufactured home park or subdivision or otherwise developed, a detailed site plan shall be submitted to, and approved by, the Floodplain Administrator prior to any development.
(c) Approval of Permits and Plans.
(1) The Floodplain Administrator shall review, or shall cause to be reviewed, all permit applications and plans in order to determine whether proposed building sites are reasonably safe from flooding.
(2) All permits and plans shall be approved only after it has been determined that the proposed work to be undertaken will be in conformance with the requirements of the State and all other applicable codes and ordinances.
(3) The Floodplain Administrator shall not issue a permit to any person who does not possess a valid contractor's license when a contractor's license is required by West Virginia State Code §21-11-10.
(4) The Floodplain Administrator, before issuance of the permit, shall require the applicant to furnish satisfactory proof that such person is duly licensed as a contractor under the provisions of West Virginia State Code. If the applicant is not licensed a written affidavit that such person is not subject to licensure as a contractor or subcontractor as defined in §21-11-3 shall be provided to the Floodplain Administrator and placed in the permit file.
(5) The Floodplain Administrator shall require copies of all necessary permits from those governmental agencies from which Federal or State Law requires approval.
(6) The Floodplain Administrator shall provide a copy of all permits to the County Assessor as required by West Virginia State Code 11-3-3A.
(7) The Floodplain Administrator shall provide a copy of all permits for new structures to the County E-911 addressing coordinator.
(8) The County E-911 addressing coordinator shall provide a copy of all requests for addresses for new structures to the County Floodplain Administrator.
(9) The City of Vienna shall provide sufficient space to allow the Floodplain Administrator to keep on file in perpetuity, in a location safe from natural hazards, all information collected during the course of the administration of this Ordinance.
(d) Application Procedures. Application for a permit and/or site plan approvals shall be made, in writing, on the forms supplied by the City of Vienna, and shall include all information stipulated under Section 1759.05.
(e) Changes. After the issuance of a permit or site plan approval by the Floodplain Administrator, no changes of any kind shall be made to the application, permit, or any of the plans, specification or other documents submitted with the application without the written consent or approval of the Floodplain Administrator.
(f) Permit Placards. The Floodplain Administrator shall issue a permit placard, which shall be prominently displayed on the premises during the time construction is in progress. This placard shall show the number of the permit, the date of its issuance and be signed by the Floodplain Administrator.
(g) Start of Construction. Work on the proposed development shall begin within 180 days after the date of issuance of the permit or the permit shall expire unless a time extension is granted, in writing, by the Floodplain Administrator. All work on the proposed development shall be completed within 18 months of permit issuance, at which time the permit shall expire, unless a time extension is granted in writing by the Floodplain Administrator. The request for a time extension shall be in writing and shall state the reasons for the extension. When considering an extension, the Floodplain Administrator shall consider the following criteria:
(1) Has the developer diligently pursued the completion of the proposed development during the 18 months?
(2) Will the granting of the extension be detrimental to public safety, health, or welfare or injurious to other property?
(h) Inspections, Stop-Work Orders, Violation Notice and Revocations.
(1) Inspections.
A. Upon learning of a potential violation of this ordinance, the Floodplain Administrator or staff shall investigate to determine whether a violation has occurred.
B. During the construction period, the Floodplain Administrator or other authorized official may inspect the premises to determine that the work is progressing in compliance with the information provided on the permit application and with all applicable laws and ordinances.
C. The Floodplain Administrator or other authorized official may inspect any development covered by this or previous ordinance to determine whether any portion of the development has been altered to be in non-compliance with the requirements of this Ordinance.
(2) Stop-Work Orders.
A. The Floodplain Administrator shall immediately issue, or cause to be issued, a "Stop-Work Order" for any development found ongoing without having obtained a floodplain determination or a permit. Disregard of a stop work order shall subject the violator to the penalties described in Section 1759.08(c).
(3) Violation Notice and Revocations.
A. When it appears after investigation that a permitted development is noncompliant with the provisions of this law and/or the conditions of the permit, the Floodplain Administrator shall notify the violator by means of written violation notice. The violation notice shall specify the nature of the violation and request that the violation be corrected within fifteen (15) days from the date appearing on the notice. Failure to correct the violation within this time period shall be cause for revocation of the permit and the governing body, or authorized employee or agent to:
1. Seek an injunction in the Circuit Court of Wood County to restrain the violator from continuing the violation, including but not limited to requests for the removal of structures or land uses from the property involved; and
2. Seek a misdemeanor conviction in magistrate court or circuit court.
(i) Certificate of Compliance.
(1) In areas of flood hazard it shall be unlawful to occupy, or to permit the use or occupancy, of any building or premises, or both, or part thereof hereafter created, erected, installed, changed, converted or wholly or partly altered or enlarged in its use or structure until a certificate of compliance has been issued by the Local Floodplain Administrator stating that the building or land conforms to the requirements of this local law. Occupying or using a building or premises in violation of this section shall subject the violator to the penalties described in Section 1759.08(c).
(2) In areas of flood hazard it shall be unlawful to inspect and approve a permanent utility connection to any building or premises, or both, or part thereof hereafter created, erected, installed or rebuilt until the inspector is in possession of a copy of the certificate of compliance issued by the Local Floodplain Administrator stating that the particular development being inspected conforms to the requirements ofthis local law. Inspection and approval of utilities in violation of this section shall subject the violator to the penalties described in Section 1759.08(c).
(3) In areas of flood hazard it shall be unlawful to install a permanent utility connection to any building or premises, or both, or part thereof hereafter created, erected, installed or rebuilt until a certificate of compliance has been issued by the Local Floodplain Administrator stating that the development conforms to the requirements of this local law. Installation of utilities in violation of this section shall subject the violator to the penalties described in Section 1759.08(c).
(4) A certificate of compliance shall be issued by the Local Administrator upon satisfactory completion of all development in areas of special flood hazard.
(5) Issuance of the certificate shall be based upon the inspections conducted as prescribed in this ordinance or local administrative procedures, and any finished construction elevation certificate, hydraulic data, flood proofing certificate, or encroachment analyses which may have been required as a condition of permit approval.
(j) Fees.
(1) A Floodplain Determination fee shall be assessed on all proposed development. This shall be a flat fee approved by the City of Vienna.
(2) Proposed development determined to be occurring in a special flood hazard area regulated by this Ordinance shall be assessed an additional fee, payable to the City of Vienna based upon a set schedule approved by the City of Vienna using the estimated value of the proposed construction as determined by the Floodplain Administrator.
(3) In addition, the applicant shall be responsible for reimbursing the City of Vienna for any additional costs for services necessary for review and/or inspection of proposed development. Services include, but are not limited to, professional engineering and surveying. The Floodplain Administrator may require a deposit towards these additional costs. Additional costs may include reimbursement for contracted services.
(4) Due to the increased cost of processing, when any work for which a permit is required by this Ordinance is started or proceeded with prior to obtaining a permit the fees above specified shall be doubled. The additional fee is intended to partially reimburse the County for the additional cost of processing permits for work already underway. To more fully recover this cost the fees above shall be tripled for every subsequent occurrence by the same person. Payment of the increased fee shall not relieve any person from complying fully with the requirements of this Ordinance in the execution of the work or from other penalties prescribed herein. (Ord. 05-13. Passed 9-12-13.)
(a) Appeals. Whenever any person is aggrieved by a decision of the Floodplain Administrator with respect to the provision of this Ordinance, it is the right of that person to appeal to the Town Council of the City of Vienna which shall be known as the Appeals Board. Such appeal shall be filed with the Town Council of the City of Vienna, in writing, within thirty (30) days after notification of the decision. Upon receipt of such appeal, the Appeals Board shall set a time and place not less than ten (10) nor more than sixty (60) days for the purpose of hearing the appeal. Notice of the time and place of the hearing shall be given to all parties at which time they may appear and be heard. The determination by the Appeals Board shall be final in all cases.
(b) Appeal Review Criteria.
(1) All appeals contesting only the permit fee, the cumulative substantial damage requirement, the flood protection setback requirement, or the freeboard requirements, may be handled at the discretion of the Appeals Board.
(2) All decisions on appeals to all other provisions of this Ordinance shall adhere to the following criteria:
A. Affirmative decisions shall only be issued by the Appeals Board upon a showing of good and sufficient cause, a determination that failure to grant the appeal would result in exceptional hardship to the applicant, and a determination that the granting of an appeal will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisances, cause fraud on or victimization of the public or conflict with existing locals laws or ordinance.
B. An affirmative decision shall be issued only upon determination that it is the minimum necessary, considering the flood hazard, to afford relief. Financial hardship, as a sole criterion, shall not be considered sufficient justification to grant an appeal.
C. An affirmative decision shall be issued for the repair or rehabilitation of historic structures upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum necessary to preserve the historic character and design of the structure.
D. The Appeals Board shall notify the applicant in writing over the signature of a City of Vienna official that 1. the issuance of a decision to allow construction of a structure below the Base Flood Elevation will result in increased premium rates for flood insurance, 2. such construction below the Base Flood Elevation increases risk to life and property. Such notifications shall be maintained with a record of all decisions as required in subsection (b)(2)E. hereof; and
E. The Appeals Board shall maintain a record of all decisions including justification for their issuance, and report such decisions issued in its biannual report to the Federal Emergency Management Agency (FEMA).
F. An affirmative decision shall not be granted for any construction, development, use or activity within any floodway area that would cause any increase in the Base Flood Elevation.
(c) Penalties. Any person who fails to comply with any or all of the requirements or provisions of this Ordinance or direction of the Floodplain Administrator, or any other authorized employee of the City of Vienna, shall be unlawful and shall be referred to the prosecuting attorney who shall expeditiously prosecute all such violators. A violator shall, upon conviction, pay a fine to the City of Vienna of not less than fifty dollars ($50.00) or more than five hundred dollars ($500.00) plus cost of prosecution. Each day during which any violation of this Ordinance continues shall constitute a separate offense. In addition to the above penalties, all other actions are hereby reserved including an action in equity for the proper enforcement of this Ordinance. The imposition of a fine or penalty for any violation of, or non-compliance with, this Ordinance shall not excuse the violation or non-compliance with the Ordinance or permit it to continue; and all such persons shall be required to correct or remedy such violations or non-compliance within a reasonable time. Any structure constructed, reconstructed, enlarged, altered or relocated in non-compliance with this Ordinance may be declared by the Town Council of the City of Vienna to be a public nuisance and abatable as such. (Ord. 05-13. Passed 9-12-13.)
(a) The County floodplain ordinance in effect on the date of annexation shall remain in effect and shall be enforced by the Municipality for all annexed areas until the Municipality adopts and enforces an ordinance which meets or exceeds the requirements for participation in the National Flood Insurance Program.
(b) Municipalities with existing floodplain ordinances shall pass a resolution acknowledging and accepting responsibility for enforcing floodplain ordinance standards prior to annexation of any area containing identified flood hazards.
(c) All plats or maps of annexation shall show the special flood hazard area boundaries, Base Flood Elevation and location of floodway where determined.
(d) In accordance with the Code of Federal Regulations, Title 44 Subpart (B) Section 59.22 (a) (9) (v) all NFIP participating communities will notify the Federal Emergency Management Agency (FEMA) and the State Coordinating Office in writing whenever the boundaries of the City of Vienna have been modified by annexation or the City of Vienna has otherwise assumed or no longer has authority to adopt and enforce flood plain management regulations for a particular area. In order that all Flood Insurance Rate Maps accurately represent the City of Vienna's boundaries, a copy of a map of the City of Vienna suitable for reproduction, clearly delineating the new corporate limits or new area for which the City of Vienna has assumed or relinquished flood plain management regulatory authority shall be included with the notification. Unless specifically exempted by law, all public utilities and Municipal, County, State and Federal entities are required to comply with this Ordinance and obtain all necessary permits. Any entity claiming to be exempt from the requirements of
this Ordinance shall provide a written statement setting forth the rationale for exemption. In addition the entity claiming exemption shall provide copies of all relevant legal documentation demonstrating the exemption. (Ord. 05-13. Passed 9-12-13.)
(a) Severability. If any section, subsection, paragraph, sentence, clause, or phrase of this Ordinance shall be declared invalid for any reason whatever, such decision shall not affect the remaining portions of this Ordinance which shall remain in full force and
effect and for this purpose the provisions of this Ordinance are hereby declared to be severable.
(b) Liability. The granting of a permit or approval of a subdivision or development plan in an identified flood-prone area, shall not constitute a representation, guarantee, or warranty of any kind by the City of Vienna, or by any official or employee thereof of the practicability or safety of the proposed use, and shall create no liability upon the City of Vienna.
(Ord. 05-13. Passed 9-12-13.)