1171.02 DETERMINATION OF AVERAGE SLOPE.
   The average slope and soil stability for any hillside development shall be determined by the City Planning Commission during the time of preliminary subdivision design. Determination shall be on an area-by-area basis with each lot sized according to the average topographic change falling within each area.
(1984 Code Sec. 151.101)