The Street and Walkway Lighting Plan shall be developed in conjunction with the standards set forth by the City of Urbana Design Criteria and Construction Standards and Drawings and with the City Engineer. The developer shall be responsible for all labor and material involved in street and sidewalk light installation including appurtenances, underground cables, trenches, poles, mast arms, yard restoration, sodding, seeding, and contour grading, including all associated cost of said work. (Ord. 4206. Passed 1-24-06.)