1197.05 ZONING CERTIFICATES REQUIRED.
   (a)   Before constructing, changing the use of, or altering any building, including accessory buildings, or changing the use of the premises, application shall be made to the Building Commissioner for a Zoning Certificate. The application shall include the following information:
      (1)   A plot plan drawn to scale showing the exact dimension of the lot to be built upon.
      (2)   The location of all buildings existing upon said lot.
      (3)   The location, dimensions, height and bulk of structures to be erected.
      (4)   The intended use.
      (5)   The proposed number of sleeping rooms, dwelling units, occupants, employees and other uses.
      (6)   The yard, open area and parking space dimensions.
      (7)   Any other pertinent data as may be necessary to determine and provide for the enforcement of this Code.
   (b)   Within ten (10) days after the receipt of application, the Building Commissioner shall issue a Zoning Certificate if the application complies with the requirements of this Code and the application is accompanied by the proper fee.
   (c)   The Zoning Certificate shall become void at the expiration of six (6) months after date of issuance, unless construction is started. If no construction is started or use changed within six months of the date of permit, a new permit is required upon proper application.
   (d)   If the application is for a Conditional Zoning Certificate, the application procedure defined in Section 1151.02 will be followed in lieu of the above regulations.
(Ord. 173-2000. Passed 12-17-00.)