For utility lines serving a subdivision, easements as set forth hereunder shall be provided. Such easements may be considered as part of the lot adjoining it in computing the lot area, but shall be kept clear of structures, trees or other improvements which would interfere with installation or maintenance of utility lines or related appurtenances.
(a) Sanitary sewer, storm sewer, and water lines may be located within the road right-of-way, but shall be outside of the pavement. In the alternative, easements may be shown on the preliminary and final plats parallel and contiguous to the road right-of-way. Such easements shall have a minimum width of ten (10) feet. Easements may also be shown on the preliminary and final plats parallel and contiguous to side and rear lot lines, whenever feasible. Such easements shall have a minimum width of twenty (20) feet.
(b) Electric power, natural gas, cable television, and telephone lines shall be located outside of the road right-of-way.
Easements for such purposes shall be shown on the preliminary and final plats parallel and contiguous to the road right-of-way. Such easements shall have a minimum width of twelve (12) feet. Easements may also be shown on the preliminary and final plats parallel and contiguous to side and rear lot lines. Such easements shall have a minimum width of twenty (20) feet. Utility lines shall be placed underground. (Ord. 173-2000. Passed 12-17-00.)