A. Design and Review Procedures
The applicant for
approval is advised to schedule a presubmittal conference with the PDSD and Tucson Water Department staff with reference to specific design or review procedures.
B. Review Procedures
are reviewed in the same manner and concurrent with the applicable
review required for
approval. Comments on the
and requests for corrections or resubmittals are made in conjunction with responses to the applicable tentative
, or
. For
located along
and
, the additional review procedures set forth in Section 5.3 and Section 5.5, respectively, apply.
C.
Inspection and Enforcement
1. Inspections
All
required by this section must be inspected by the PDSD prior to a final certificate of occupancy being issued by the
or prior to the
being occupied.
2. Enforcement
With the permission of the owner or tenant,
staff may enter a
or any part of a
for the purpose of performing inspections to verify compliance with the standards of this section.
D. Variances