7.6.9.   ADMINISTRATION
   A.   Design and Review Procedures
   The applicant for approval is advised to schedule a presubmittal conference with the PDSD and Tucson Water Department staff with reference to specific design or review procedures.
   B.   Review Procedures
    are reviewed in the same manner and concurrent with the applicable review required for approval. Comments on the and requests for corrections or resubmittals are made in conjunction with responses to the applicable tentative , or . For located along and , the additional review procedures set forth in Section 5.3 and Section 5.5, respectively, apply.
   C.    Inspection and Enforcement
      1.   Inspections
      All required by this section must be inspected by the PDSD prior to a final certificate of occupancy being issued by the or prior to the being occupied.
      2.   Enforcement
      With the permission of the owner or tenant, staff may enter a or any part of a for the purpose of performing inspections to verify compliance with the standards of this section.
   D.   Variances
   The Design Review Board (DRB) shall review all variance requests from the and Screening Standards as provided in Section 2.2.6.C.5 and forward a recommendation in accordance with Section 2.2.6.B.6.