903.22 PAVEMENT CUTS.
   (a)   All pavement cuts made by any person shall be repaired by such person in accordance with the pavement cut restoration standards established by the City Engineer and on file in his/her office.
   (b)   Any person making a pavement cut within the Right-of-Way exceeding 50 square feet or 25 linear feet measured in the direction of travel within (5) years of the completion of a contract for the resurfacing of such pavement shall provide for the resurfacing of the entire width of the travel lane within which the pavement cut was made. The resurfacing of the lane shall be accomplished within 6 months of the completion of the associated work within the Right-of-Way. The resurfacing shall consist of planing and paving of the surface course of asphalt for a minimum length of 25 feet measured in the direction of traffic. The person making the pavement cut shall be responsible for the resurfaced lane for a period of two (2) years from the date of final inspection. A sufficient maintenance bond in an amount determined by the City Engineer shall be kept during this period.
(Ord. 74-2007. Passed 11-19-07.)