§ 152.51 WATER MAINS AND APPURTENANCES.
   (A)   The subdivider shall provide the subdivision with a complete water main supply system which shall be connected to the municipal water supply. Water systems shall be looped (meaning having two distinct sources of supply or points of connection to the existing system) wherever possible. Where not presently possible, main shall be installed to allow for future looping.
   (B)   Water mains shall be located between the proposed sidewalk and the proposed curb. The minimum size for water mains shall be six inches. Larger size water mains shall be provided if required to adequately serve the proposed subdivision. If larger size mains are required by the village to serve areas other than the proposed subdivision, the cost difference may be paid by the village in accordance with the current policies in effect at the time the subdivision is considered. The subdivider must obtain approval from the Village Engineer of the water system design before any subdivision construction is started.
   (C)   Water mains and appurtenances shall be installed in accordance with the village construction standards and with the most recent edition of Standard Specifications for Water and Sewer Main Construction in Illinois. Connection of new water mains to the existing system shall not be made until approved by the Village Engineer.
   (D)   Water mains shall be CL350 Tyton joint ductile iron pipe, or polyvinyl chloride (PVC) with a minimum rating of DR18 PC 235 psi. Iron pipe size SDR21 or SDR26 is not permitted.
   (E)   A locating tape (tracer wire) shall be installed with all PVC water mains. Tracer wire shall have an HDPE jacket; THHN coated wire is not allowed.
   (F)   Gate valves and boxes shall be provided to adequately valve the water system.
   (G)   Fire hydrants and appurtenances shall be furnished and installed by the subdivider at a maximum spacing of 600 feet. Hydrants shall be Mueller Model A423, five and one-fourth inch diameter three-way hydrants. All hydrants shall be isolated by a valve.
   (H)   An individual water service shall be installed for each lot or parcel in the subdivision. All service lines shall be 200 psi copper tube size HDPE tubing. Fittings shall be Mueller type C100 compression fittings.
   (I)   All water mains and service lines shall be laid with a minimum cover of four feet.
   (J)   All water main and service line trenches located below or within two feet of street surfaces, sidewalks, curbs and gutters shall be backfilled with select granular backfill and mechanically compacted to a minimum of 95% SPD in minimum 12-inch loose lifts.
   (K)   All other water main trenches shall be compacted by mechanical compaction, jetting and water soaking or another means, as approved by the Village Engineer.
   (L)   All new water mains and appurtenances shall be visually inspected, disinfected, pressure tested and leak tested. The testing shall be done by the subdivider’s engineer or an independent testing company under the observation of the Village Engineer. The system must pass all tests prior to being connected to the municipal water system.
   (M)   All water main and service construction shall be performed in accordance with the Standard Specifications for Water and Sewer Main Construction in Illinois, latest edition.
(Ord. 16-102, passed 4-4-2016)