10-18C-7: EASEMENT AND RIGHT OF WAY REPAIR:
The surface of all disturbed areas within easements or rights of way shall be returned to its original good condition and properly backfilled and compacted per city utility specifications. Excess excavated material and vegetation debris shall be removed from the site. Property adjoining the easement or right of way shall be protected from damage during trenching, utility installations and backfilling, and all work shall stay within the easement or right of way limits. All damage to adjoining or neighboring property caused by any act or neglect on the part of the contractor shall be repaired at the contractor's expense to the satisfaction of the city and/or the property owner. (Ord. 2012.04, 1-18-2012)