10-18C-2: REVIEW PROCESS:
Application forms are available from and shall be submitted to the building department. See chapter 6 of this title for information required with the application. A list of additional information that may be required may be obtained from the building department. Included shall be the following:
   A.   Site Plan: The site plan shall show all property boundaries, existing and proposed new underground utility mains, laterals, manhole inverts, piping grades, valves, meters and thrust blocks.
   B.   Material And Installation Specification And Connection Details: Underground piping shall comply with city specifications.
   C.   As Built Drawings: These drawings shall be furnished to the building department for record purposes within thirty (30) days after the work is completed. (Ord. 2012.04, 1-18-2012)