8-2-2: CONNECTION REQUIRED:
Unless waived as provided in section 8-2-4 of this chapter, it is hereby required that at the time any new development activity occurs on any parcel of real property located within the city boundaries, the property owner shall be required to physically connect such real property to the Toquerville secondary water system (TSWS), as described in this chapter. If the new development activity is to occur on a single parcel of real property, which is to remain a single parcel of real property following such development activity, the owner of such real property shall be required to make at least one connection to the TSWS for such parcel of real property. If the new development activity is to occur on real property which is a proposed or existing subdivision, then the owner of each parcel of real property or each lot within the proposed or existing subdivision shall be required to make at least one connection to the TSWS for each parcel of real property or each lot within the proposed or existing subdivision. (Ord. 2009.01, 2-12-2009)