7-4-1: REGULATION:
After any street has been constructed, reconstructed or paved by the city, under contract with the city, or under a permit from the city, the pavement surface of such street shall not thereafter be disturbed, cut, trenched or opened for a period of two (2) years from the time construction or reconstruction of such street is completed. (Ord. 2011.02, 4-14-2011; amd. 2014 Code)