§ 153.153 CONCRETE CRADLE.
   Where, in the opinion of the developer’s engineer or the village’s Maintenance Superintendent, subgrade conditions warrant extra precautions for the bedding of pipe, the developer’s engineer or the village’s Maintenance Superintendent may order the construction of a concrete cradle to support the pipe. The cradle shall be constructed as directed by the developer’s engineer.
(Ord. 97-7, passed 7-1-1997, § 5.16)