§ 153.146 PILING EXCAVATED MATERIAL.
   All excavated material shall be piled in a manner that will not endanger the work and that will avoid obstructing streets, sidewalks, and driveways. Excavated materials suitable for backfilling shall be stockpiled separately on the site. No materials shall be placed closer than two feet to the edge of an excavation. Fire hydrants under pressure, valve pit covers, valve boxes, curb stop boxes, or other utility controls shall be left unobstructed and accessible until the work is completed. Gutters shall be kept clear or other satisfactory provisions made for street drainage. Natural watercourses shall not be obstructed or polluted.
(Ord. 97-7, passed 7-1-1997, § 5.16)