§ 153.143 EXCAVATION BELOW GRADE.
   In cases where the excavation is carried beyond or below the lines and grades given by the developer’s engineer, all such excavated space shall be refilled with suitable granular material.
(Ord. 97-7, passed 7-1-1997, § 5.16)