§ 54.36  PERMITS REQUIRED.
   All significant industrial users proposing to connect to or to contribute to the POTW shall obtain a wastewater contribution permit at least 90 days before connecting to or contributing to the POTW.  All existing industrial users connected to or contributing to the POTW shall obtain a wastewater contribution permit within 180 days after the effective date of this chapter.
(1974 Code, § 54.36)  (Ord. 29-84, passed 9-4-1984; Am. Ord. 26-87, passed 7-6-1987; Am. Ord. 9-91, passed 3-4-1991)  Penalty, see § 54.99