§ 51.077 SUBMISSION OF CALCULATIONS, DRAWINGS REQUIRED BEFORE PERMIT APPROVED.
   Before any Metropolitan Water Reclamation District of Greater Chicago sewerage system permit is approved by the village, the applicant therefore, shall submit to the village calculations and detailed drawings of the stormwater retention facilities. The drawings must include topography, size, capacity, slope of banks, soil borings, type of landscaping, inlets, outlet control, and other pertinent data. In the event the Village Engineer determines that there is unsuitable soil in pond areas, and so recommends to the Village Board, then the Village Board shall require the applicant to remove the undesirable soil as a condition of the applicant's development and relocate the same as shall be approved by the Village Board on the advice of the Village Engineer.
(Ord. 74-0-043, passed 11-18-74; Am. Ord. 2008-O-048, passed 10-7-08)