(A) All utility lines that pass under a street or alley shall be installed before the street or alley is paved.
(B) When it is necessary that utility lines pass under the street or alley pavement, they shall be installed to a point at least ten feet beyond the edge of the pavement.
(Ord. 08-29, passed 10-21-2009)