(A) The city shall be given opportunity to inspect all phases of the construction of improvements for subdivisions. The subdivider, or his or her contractor, shall maintain daily contact with the City Engineer and Director of Public Works during construction of improvements.
(B) No sanitary sewer, water or storm sewer pipe shall be covered without approval of the City Engineer and the Director of Utilities. No concrete shall be poured for streets, structures or curbs and gutters without their approval. No flexible base material shall be placed on the street subgrade, or asphaltic surface applied to the flexible base of a street, without such approval.
(Ord. 08-29, passed 10-21-2009)