§ 150.126 ACCEPTANCE OF IMPROVEMENTS.
   (A)   Where a new system is connected to the city’s wastewater treatment facilities, conforms to the city’s design and construction requirements, is located in a public right-of-way or dedicated public utility easement, and is accepted by the City Board of Public Works (Tell City Sewer Department) for maintenance, the petitioner may dedicate the public components of the system to the city as public improvements after installation. As-built plans for the completed system, as accepted, shall be filed with the Wastewater Superintendent and the Plan Commission.
   (B)   When terrain or other conditions require the use of individual lift stations at each lot then these facilities shall be, and shall remain, the property of the owner of the lot for the owner’s installation, operation, and maintenance. “As-built” plans for the completed systems shall be filed with the city’s Wastewater Superintendent and the Plan Commission.
(Ord. 970, passed 3-5-2007)