For any subdivision of land, permanent survey monuments shall be set at the corners and other points of angular change in the perimeter of the subdivision, and at all intersections of lot lines with other lines, and at points of angular change in lot lines. Monuments shall be not less than 5/8-inch diameter by 30-inch long steel bars with the surveyor’s registration number on the cap. Monuments shall extend not more than one inch above, or more than three inches below the finished grade of the land.
(A) At least two permanent and adequate survey monuments shall be established as a Bench Mark and shall be clearly designated on the plat each with its distance above mean sea level.
(B) At least two of the permanent survey monuments shall be clearly designated on the plat with the state plane coordinates.
(Ord. 970, passed 3-5-2007)